Case Studies
from #thinkaccess

Earlsgate EFW Project

#thinkaccess is thrilled to share our recent accomplishment on the cutting-edge Earlsgate EFW project! Our client entrusted us with the challenging task of fitting heavy-duty steel plates within the waste bunker, and we’re proud to have got the job done efficiently and cost-effectively. Given the unique location and demands of the project, we opted for the…

Rookery EFW – Final Clean and Paint Touch-Up

Following the exceptional delivery of our previous ‘Final Clean and Paint Touch Up’ Energy from Waste contracts, #thinkaccess were our customers preferred choice at the closing stages of the Rookery Efw construction project to carry out these works. Having been on site for the previous 12 months carrying out various work scopes throughout the construction phase we…

THFC Steel Erection and Temp Stay Removal

Project Overview The construction of Tottenham Hotspur Football Club’s new stadium presented numerous engineering challenges, particularly in the erection and subsequent removal of temporary structural supports. Think Access was engaged by the main on-site steel erection contractor to undertake the critical task of removing massive temporary stay jacks from the stadium’s roof structure. These stay…

TeesRep Biomass Cladding Installation

Not for the faint hearted! This project is certainly one of the more challenging of the past year. With heights in excess of 200ft installing cladding sheets on days that seem calm at ground level become very complex at such heights. Wind speeds were unpredictable on most days, and with a site of this size…

Manchester Airport Safety Netting and Edge Protection

As far as temporary access installations go this project is up there as one of the largest we have ever completed. Second only to Wembley Stadium. On site for nearly 2 years we installed all the Safety Netting, Edge Protection and Stair Access towers for our client to allow them to safely access the roof areas. A…

Manchester Airport T2 Cladding

Having been on site from the commencement of the project our customer knew the logical methodology for this installation was via Rope Access. Running along the connection point of the existing terminal 2 building and the new extension meant there was an access issue with regards to cladding and weatherproofing in this area. Especially when you consider…