Rope Access Support for Structural Steel Painting
Location: Riverside 2 Energy from Waste ProjectScope of Work: General rope access support to a principal steel contractor, including torquing of steel connections, galvanising spray to affected areas and painting of structural steelwork.Team Deployment: IRATA-qualified rope access technicians.Access Method: IRATA rope access throughout; rigs set using pull-through and aid climbing techniques to access areas where…
Rope Access Support on Oil Refinery
Location: Lindsey Oil Refinery, ImminghamScope of Work: General rope access support to assist with cable installation and management.Team Deployment: IRATA-qualified rope access technicians.Access Method: IRATA rope access techniques. Overview: Think Access was engaged by a specialist instrumentation contractor to provide rope access support at an operational oil refinery in Lincolnshire. The task centred on assisting…
Intumescent Coating Application and Certification, Westfield Energy Recovery Facility
Location: Westfield Energy Recovery Facility, Lochgelly, Fife, ScotlandScope of Work: Application and certification of intumescent fire protection coating system to structural steelwork across 42 locations within the plant.Team Deployment: IRATA-qualified rope access technicians and IPAF-certified MEWP operators, working under a nominated rope access supervisor.Access Method: Primary access via boom-lift MEWPs fitted with anti-entrapment devices; IRATA…
Air-Cooled Condenser (ACC) Duct Touch-Up Painting
Location: Skelton Grange Energy-from-Waste FacilityScope of Work: Touch-up painting of ACC steam ducts, turbine ducting, diagonal supports, undersides and ACC fans outside the boiler hall.Team Deployment: IRATA-qualified rope access technicians supervised by iCATS-trained supervisor. Access Method: MEWP (cherry picker) and rope access, with IRATA-qualified technicians. Overview: Think Access was engaged to carry out the full…
Over-Water Concrete Repair & Protective Coating Works
Location: Brentford Docks Marina, West LondonScope of Work: Visual inspection, preparation and concrete repair of a failed over-water repair section; application of protective coating system to match existing finish.Team Deployment: 3 IRATA-qualified rope access technicians. Access Method: IRATA-compliant rope access, weight trolley anchor system rigged and rescue provisions set specific to the over-water work zone….
ACC Overhang Cladding Installation & A-Frame Remedial Works
Location: West BromwichScope of Work: Inspection and remedial trimming of internal A-frame cladding panels; installation of approx. 60 corrugated cladding sheets to the ACC overhang structure via IRATA rope access.Team Deployment: 3 IRATA-qualified rope access technicians. Access Method: IIRATA-compliant rope access — ropes rigged and tension lines set specific to each working area across the…