Grangemouth Netting and Edge Protection Installation
Having identified an access issue with standard mansafe Safety Netting (obstructions close to the works area) and needing access to steelwork #thinkaccess were employed to install both Safety Netting and ‘Tensioned Access Platform’ netting to the structure, as well as temporary Edge Protection complying to EN13374 and an access Stair Tower. With experienced FASET and…
Ferrybridge Plant Paint and Clean Down
Following from successful site works throughout the construction phase of the project #thinkaccess were invited to tender for the final clean down of the FM2 plant, as well as complete any coatings/paintings works left to be complete or in need of remedial works. Having been awarded the project #thinkaccess mobilised a team of between 30-42…
Factory Clean Down
Following from fire damage, #thinkaccess assisted a regular customer with the cleaning of fire damaged panels and roof sheets to an exacting standard. Utilising both MEWP and IRATA Rope Access means we were able to complete this project with very little disruption to the machinery within the building thus meaning this factory could be back…
Coventry Water Park Painting
No we didn’t get to have a go on the slides… but enjoy this project we did, nonetheless. Employed by our customer to carry out remedial painting works following construction damage, #thinkaccess supplied qualified Rope Access Painters to this project on a daily basis, as required. Whilst on site we also assisted with installation of…
Covent Garden Market Safety Netting
Did you know Covent Garden is one of the most popular attractions in the world, with roughly 44m visitors a year!? No wonder our customer placed their trust in a company they knew would deliver the project with the least disruption as possible and maintain a professional manner to match the buildings prestigious status. Looking…
Brigg Power Station Stack Inspection
A yearly contract that #thinkaccess complete for our customer, we were employed to carry out a yearly stack inspection/survey on the main stack at Brigg Power Station during their 2020 outage. Completing both visual/photographic inspection via Rope Access and torque checking/tightening of the main stack bolts, this is a local contract our employees like to…